Smith Co., MS
- Discovered by Tellus in 2016 with Proprietary 3-D Seismic.
- Current Production: 430 BOPD; 1 Producing Well.
- Cumulative Production: 160 MBO.
- 1,000 acres held by production (“HBP”).
- Currently designing waterflood with expected EUR of 4 MMBO+.